| Customer/ Plant | Project | Reference |
|---|---|---|
| swb Erzeugung | Installation of Titanum Tubing and Condenser - Installation of condenser tubing Assembly and installation connection tubing |
Journal No. 12 Page 25 |
| Nuclear power plants in Germany | Disassambly of major components with expertise and high- tech equipment - From disassembly to packing |
Journal No. 11 Page 7 |
| E.ON Benelux Power Plant Maasvlakte |
Design and construstion of the new control valve | Journal No. 8 Page 20 |
| Deutsche BP AG Emsland Refinery |
Major valve overhaul | Journal No. 8 Page 16 |
| RWE Power Power Plant Weisweiler Unit H |
Exchange of HD tubes Planning, delivery, prefabrication, dis- and reassembly |
Journal No. 8 Page 12 |
| E.ON Kernkraft Nucler Power Plant Unterweser |
Exchange of a tank for chemicals with 30,000 litres capacity | Journal No. 8 Page 10 |
| E.ON Kernkraft Nuclear Power Plant Würgassen |
Dismantling of the LP turbine rotor Disassembly of the condenser |
Journal No. 8 Page 8 |
| BKB TRV Buschhaus |
Turbine overhaul (45 MW) Replacement of the old auxiliary condenser Complete inspection of the generator (cooperation with Electrical and Mechanical Engineering) |
Journal No. 5 Page 16 |
| E.ON Kraftwerke Power Plant Irsching Unit 3 |
440 MW Turbine Refurbishment of the drain studs of the high pressure turbine |
Journal No. 5 Page 7 |
| RWE Power Power Plant Gersteinwerk Unit K |
Turbine Refurbishment of the drain studs on the control valves 1 to 4 of the high pressure turbine |
Journal No. 5 Page 6 |
| E.ON Kraftwerke Power Plant Scholven Unit F |
Component test facility COMTES700 Installation of all components (cooperation with Boiler TechNo.logy) |
Journal No. 5 Page 3 |
| E.ON Kernkraftwerk Nuclear Power Plant Stade Nuclear Power Plant Würgassen |
Dismantling activities Disassembly and disposal |
Journal No. 4 Page 18 |
| E.ON Kraftwerke Power Plant Staudinger |
Erection of a sewage sludge co-combustion plant for the disposal of 60,000 t sewage sludge annually (cooperation with Electrical Engineering, I&C Tech., Mechanical Engineering) |
Journal No. 4 Page 4 |
| E.ON Kraftwerke Power Plant Shamrock |
Exchange of the hot reheat line 1 Delivery and assembly |
Journal No. 3 Page 5 |
| E.ON Kraftwerke Power Plant Franken 1 Units 1 und 2 |
Overhaul of steam generators, vessels, accessories, valves (cooperation with Boiler TechNo.logy) |
Journal No. 3 Page 4 |
| Gemeinschaftskernkraftwerk Grohnde GmbH & CO.OHG |
Replacement of two heat exchangers in the feedwater system | Journal No. 3 Page 3 |
| E.ON Kraftwerke Power Plant Shamrock |
Exchange of hot preheat lines Delivery and installation |
Journal No. 2 Page 13 |