References Process Equipment Technology

References Process Equipment Technology
Customer/ Plant Project Reference
swb Erzeugung Installation of Titanum Tubing and Condenser
- Installation of condenser tubing Assembly and installation connection tubing
Journal No. 12
Page 25
Nuclear power plants in Germany Disassambly of major components with expertise and high- tech equipment
- From disassembly to packing
Journal No. 11
Page 7
E.ON Benelux
Power Plant Maasvlakte
Design and construstion of the new control valve Journal No. 8
Page 20
Deutsche BP AG
Emsland Refinery
Major valve overhaul Journal No. 8
Page 16
RWE Power Power Plant Weisweiler
Unit H
Exchange of HD tubes
Planning, delivery, prefabrication, dis- and reassembly
Journal No. 8
Page 12
E.ON Kernkraft
Nucler Power Plant
Unterweser
Exchange of a tank for chemicals with 30,000 litres capacity Journal No. 8
Page 10
E.ON Kernkraft
Nuclear Power Plant
Würgassen
Dismantling of the LP turbine rotor
Disassembly of the condenser
Journal No. 8
Page 8
BKB
TRV Buschhaus
Turbine overhaul (45 MW)
Replacement of the old auxiliary condenser Complete inspection of the generator
(cooperation with Electrical and Mechanical Engineering)
Journal No. 5
Page 16
E.ON Kraftwerke
Power Plant Irsching
Unit 3
440 MW Turbine
Refurbishment of the drain studs of the high pressure turbine
Journal No. 5
Page 7
RWE Power
Power Plant Gersteinwerk
Unit K
Turbine
Refurbishment of the drain studs on the control valves 1 to 4 of the high pressure turbine
Journal No. 5
Page 6
E.ON Kraftwerke
Power Plant Scholven
Unit F
Component test facility
COMTES700
Installation of all components
(cooperation with Boiler TechNo.logy)
Journal No. 5
Page 3
E.ON Kernkraftwerk
Nuclear Power Plant Stade
Nuclear Power Plant Würgassen
Dismantling activities
Disassembly and disposal
Journal No. 4
Page 18
E.ON Kraftwerke
Power Plant Staudinger
Erection of a sewage sludge co-combustion plant for the disposal of 60,000 t sewage sludge annually
(cooperation with Electrical Engineering, I&C Tech., Mechanical Engineering)
Journal No. 4
Page 4
E.ON Kraftwerke
Power Plant Shamrock
Exchange of the hot reheat line 1
Delivery and assembly
Journal No. 3
Page 5
E.ON Kraftwerke
Power Plant Franken 1
Units 1 und 2
Overhaul of steam generators, vessels, accessories, valves
(cooperation with Boiler TechNo.logy)
Journal No. 3
Page 4
Gemeinschaftskernkraftwerk
Grohnde GmbH & CO.OHG
Replacement of two heat exchangers in the feedwater system Journal No. 3
Page 3
E.ON Kraftwerke
Power Plant Shamrock
Exchange of hot preheat lines
Delivery and installation
Journal No. 2
Page 13
 