Customer/ Plant Project Reference
     
Mainova Specialist expertise guarantees availability. Electronic circuit boards refurbished Journal No. 16
Seite 23
RWE Power Gersteinwerk Power Plant Modernisation of hydraulic protection and control systems on three 400 MW turbines.From the initial concept through to commissioning, documentation and operator training Journal No. 15
Page 25
Thyssen Schachtbau Shaft sinking with tailor-made instrumentation. Special solutions for an unusual project including on-site implementation Journal No. 15
Page 31
Wilhelmshaven
power plant
New control system for gas turbine plant: full control system replacement, basic and detailed engineering, Hardware engineering, Software engineering, Commissioning, Operator briefing / training Journal No. 14
Page 5
Elberfeld
cogeneration plant
Construction of a secondary fuel feeding unit: Delivery of switchgear system, field installation, secondary fuel feeding system automation, integration into existing automation system, construction of a flue gas treatment plan Journal No. 14
Page 11
Wilhelmshaven
power plant
Air-conditioning system automation upgrade: concept development, Project management, commissioning, operator briefing / training Journal No. 14
Page 15
District heating station
In Gelsenkirchen
Modernisation of burner and boiler control systems: control system centralization, delivery of the hardware and software, project management, commissioning Journal No. 14
Page 19
Drive workshop A service by the Instrumentation and Control: Technology Division of EAS, General overhaul, repair, maintenance and conversion of drives and actuators Journal No. 14
Page 23
RWE Power Gersteinwerk Power Plant Modernisation of hydraulic system for 400 MW BBC turboset: concept, detailed engineering design, production or procurement of required components, Modification, Instruction and training of operating staff Journal No. 13
Page 21
Papermill Fripa Energy supply ensured
- Electrical and automation systems for new gas turbine power plant with waste and service
(cooperation with Electrical Engineering)
Journal No. 12
Page 21
Pfleiderer AG Optimisation of PCS 7 Automation System
- Upgrading of CHP Plant through application of  Premium Plant Library
Journal No. 12
Page 15
Innovatherm GmbH High- End Boiler Protection Technology
- Complete modernisation of safety- oriented control and monitoring functions
Journal No. 12
Page 11
Staudinger Power Plant Modification of coal handling plant automation system
- Conversion from Procontrol P 14 to Simatic PCS 7
Journal No. 11
Page 15
RWE Power Production of activated lignite HOK ensured Journal No. 11
Page 11
E.ON Kraftwerke
Power plant Datteln
EAS I&C involves in new construction projects for E.ON Kraftwerke
Construction of process system on behalf of ABB
Journal No. 10
Page 26
Rieger
Paper Mill
Steam turbine retrofit to a combined heat and power plant
(cooperation with Electrical Engineering)
Journal No. 10
Page 22
Meggle AG, Wasserburg Modification of turbine control system in an industrial plant
Replacement of the hydraulic turbine control system with a digital control system
(cooperation with Mechanical Engineering)
Journal No. 10
Page 19
Power generation and
industrials plant
Development of a power plant-compliant module library for PCS 7 version 7 completed Journal No. 10
Page 15
E.ON Benelux
KW Maasvlakte Block E 1
Repair services of the EAS workshops
Assessment, manufacturing of new parts and execution of repair work in 15 hours
Journal No. 10
Page 14
WSW
Wuppertaler Stadtwerke
Modification of the boilers at Viehof heating plant
Refurbishment of overall plant after reduction of burner capacity
Journal No. 10
Page 8
E.ON Ruhrgas
High-pressure calibration facility
Replacement of the control system in a high-pressure calibration facility
Modernisation and optimisation
Journal No. 10
Page 4
DK Recycling und Roheisen
GmbH
Replacement of the safety-related control and regulation of the ignition hood burner in the sintering plant Journal No. 8
Page 28
Basell Polyolefine Optimisation of the 23,5 MW turine extraction/ back-pressure control Journal No. 7
Page 14
Innovatherm GmbH Conception and Exchange of the automation system Journal No. 7
Page 11
E.ON Benelux
Power Plant Maasvlakte
Updating of the I&C concept within the projekt "Retrofit" Journal No. 6
Page 12
Mainz-Wiesbaden AG power plants
Power Plant 2
Optimisation measure of the feedwater supply Journal No. 6
Page 10
STEAG
Power Plant Voerde
Units A and B
Instrumentation and control overhaul of two hard coal-fired units, each with a capacity of 710 MW Journal No. 6
Page 8
E.ON Kraftwerke
Power Plant Shamrock
Optimisation of the waste water treatment plant automation level Journal No. 6
Page 6
E.ON Kraftwerke
Power Plant Scholven
Unit C
Exchange automaton system and upgrade to fully-automated mode Journal No. 6
Page 3
E.ON Kraftwerke
Power Plant Scholven
FGD plants
Automation of the measuring of solids in FGD plants Journal No. 5
Page 23
Cooperative power plant
Veltheim
Units 2 and 3
Alteration of coal handling plant process control system
Automation of the unit coal handling facilities
Journal No. 5
Page 20
E.ON Kraftwerke
Power Plant Robert Frank,
Landesbergen
Refurbishment of a live steam line
(cooperation with Mechanical Engineering)
Journal No. 4
Page 12
Utility company
Stadtwerke Flensburg
Modernisation of the turbine control system Journal No. 4
Page 11
E.ON Kraftwerke
Power Plant Staudinger
FGD
Revamping the process control system of the FGD waste water plant Journal No. 4
Page 10
E.ON Kraftwerke
Power Plant Scholven
Unit F
New pulverised-fuel supply tank
Automation, field connection, sofware development and visualisation
Journal No. 4
Page 9
E.ON Kraftwerke
Power Plant Scholven
CHP Buer
Component and air preheater fire monitoring Replacement by SIMATIC S7 300 Journal No. 4
Page 8
E.ON Kraftwerke
Power Plant Staudinger
I&C optimization of a sewage co-combusting plant Journal No. 4
Page 6
E.ON Kraftwerke
Power Plant Staudinger
Erection of a sewage sludge co-combustion plant for the disposal of 60, 000 t sewage sludge annually
(cooperation with Process Equipment Technology, Electrical & Mechanical Engineering)
Journal No. 4
Page 4
E.ON Kraftwerke
Power Plant Shamrock
Boilers 2 and 4
Conceptual design and implementation of the new oil ignition burner system and the automatic air flow control system Journal No. 3
Page 15
RWE Neurath Modification of Pit Bunker Bucket Wheel Excavators Journal No. 3
Page 13
E.ON Kraftwerke
Power Plant Scholven
Unit C
Modification of the feed water pump protective system from TELEPERM MEA to ABB Symphony Journal No. 2
Page 24
Hecking Deotexis GmbH,
Neukirchen
Follow-up order after the energy-related optimization of the steam generating facility
I&C Optimisation of the control system
(cooperation with Boiler Technology)
Journal No. 2
Page 22
E.ON Kernkraft
Nuclear Power Plant Unterweser
Overhaul I&C and electrical engineering
(cooperation with Electrical Engineering)
Journal No. 2
Page 18
Leibstadt Nuclar Power Plant,
Switzerland
Modification work on stand-by diesel generators Journal No. 2
Page 17
 