References I&C Technology
| Customer/ Plant | Project | Reference |
|---|---|---|
| Mainova | Specialist expertise guarantees availability. Electronic circuit boards refurbished | Journal No. 16 Seite 23 |
| RWE Power Gersteinwerk Power Plant | Modernisation of hydraulic protection and control systems on three 400 MW turbines.From the initial concept through to commissioning, documentation and operator training | Journal No. 15 Page 25 |
| Thyssen Schachtbau | Shaft sinking with tailor-made instrumentation. Special solutions for an unusual project including on-site implementation | Journal No. 15 Page 31 |
| Wilhelmshaven power plant |
New control system for gas turbine plant: full control system replacement, basic and detailed engineering, Hardware engineering, Software engineering, Commissioning, Operator briefing / training | Journal No. 14 Page 5 |
| Elberfeld cogeneration plant |
Construction of a secondary fuel feeding unit: Delivery of switchgear system, field installation, secondary fuel feeding system automation, integration into existing automation system, construction of a flue gas treatment plan | Journal No. 14 Page 11 |
| Wilhelmshaven power plant |
Air-conditioning system automation upgrade: concept development, Project management, commissioning, operator briefing / training | Journal No. 14 Page 15 |
| District heating station In Gelsenkirchen |
Modernisation of burner and boiler control systems: control system centralization, delivery of the hardware and software, project management, commissioning | Journal No. 14 Page 19 |
| Drive workshop | A service by the Instrumentation and Control: Technology Division of EAS, General overhaul, repair, maintenance and conversion of drives and actuators | Journal No. 14 Page 23 |
| RWE Power | Gersteinwerk Power Plant Modernisation of hydraulic system for 400 MW BBC turboset: concept, detailed engineering design, production or procurement of required components, Modification, Instruction and training of operating staff | Journal No. 13 Page 21 |
| Papermill Fripa | Energy supply ensured - Electrical and automation systems for new gas turbine power plant with waste and service (cooperation with Electrical Engineering) |
Journal No. 12 Page 21 |
| Pfleiderer AG | Optimisation of PCS 7 Automation System - Upgrading of CHP Plant through application of Premium Plant Library |
Journal No. 12 Page 15 |
| Innovatherm GmbH | High- End Boiler Protection Technology - Complete modernisation of safety- oriented control and monitoring functions |
Journal No. 12 Page 11 |
| Staudinger Power Plant | Modification of coal handling plant automation system - Conversion from Procontrol P 14 to Simatic PCS 7 |
Journal No. 11 Page 15 |
| RWE Power | Production of activated lignite HOK ensured | Journal No. 11 Page 11 |
| E.ON Kraftwerke Power plant Datteln |
EAS I&C involves in new construction projects for E.ON Kraftwerke Construction of process system on behalf of ABB |
Journal No. 10 Page 26 |
| Rieger Paper Mill |
Steam turbine retrofit to a combined heat and power plant (cooperation with Electrical Engineering) |
Journal No. 10 Page 22 |
| Meggle AG, Wasserburg | Modification of turbine control system in an industrial plant Replacement of the hydraulic turbine control system with a digital control system (cooperation with Mechanical Engineering) |
Journal No. 10 Page 19 |
| Power generation and industrials plant |
Development of a power plant-compliant module library for PCS 7 version 7 completed | Journal No. 10 Page 15 |
| E.ON Benelux KW Maasvlakte Block E 1 |
Repair services of the EAS workshops Assessment, manufacturing of new parts and execution of repair work in 15 hours |
Journal No. 10 Page 14 |
| WSW Wuppertaler Stadtwerke |
Modification of the boilers at Viehof heating plant Refurbishment of overall plant after reduction of burner capacity |
Journal No. 10 Page 8 |
| E.ON Ruhrgas High-pressure calibration facility |
Replacement of the control system in a high-pressure calibration facility Modernisation and optimisation |
Journal No. 10 Page 4 |
| DK Recycling und Roheisen GmbH |
Replacement of the safety-related control and regulation of the ignition hood burner in the sintering plant | Journal No. 8 Page 28 |
| Basell Polyolefine | Optimisation of the 23,5 MW turine extraction/ back-pressure control | Journal No. 7 Page 14 |
| Innovatherm GmbH | Conception and Exchange of the automation system | Journal No. 7 Page 11 |
| E.ON Benelux Power Plant Maasvlakte |
Updating of the I&C concept within the projekt "Retrofit" | Journal No. 6 Page 12 |
| Mainz-Wiesbaden AG power plants Power Plant 2 |
Optimisation measure of the feedwater supply | Journal No. 6 Page 10 |
| STEAG Power Plant Voerde Units A and B |
Instrumentation and control overhaul of two hard coal-fired units, each with a capacity of 710 MW | Journal No. 6 Page 8 |
| E.ON Kraftwerke Power Plant Shamrock |
Optimisation of the waste water treatment plant automation level | Journal No. 6 Page 6 |
| E.ON Kraftwerke Power Plant Scholven Unit C |
Exchange automaton system and upgrade to fully-automated mode | Journal No. 6 Page 3 |
| E.ON Kraftwerke Power Plant Scholven FGD plants |
Automation of the measuring of solids in FGD plants | Journal No. 5 Page 23 |
| Cooperative power plant Veltheim Units 2 and 3 |
Alteration of coal handling plant process control system Automation of the unit coal handling facilities |
Journal No. 5 Page 20 |
| E.ON Kraftwerke Power Plant Robert Frank, Landesbergen |
Refurbishment of a live steam line (cooperation with Mechanical Engineering) |
Journal No. 4 Page 12 |
| Utility company Stadtwerke Flensburg |
Modernisation of the turbine control system | Journal No. 4 Page 11 |
| E.ON Kraftwerke Power Plant Staudinger FGD |
Revamping the process control system of the FGD waste water plant | Journal No. 4 Page 10 |
| E.ON Kraftwerke Power Plant Scholven Unit F |
New pulverised-fuel supply tank Automation, field connection, sofware development and visualisation |
Journal No. 4 Page 9 |
| E.ON Kraftwerke Power Plant Scholven CHP Buer |
Component and air preheater fire monitoring Replacement by SIMATIC S7 300 | Journal No. 4 Page 8 |
| E.ON Kraftwerke Power Plant Staudinger |
I&C optimization of a sewage co-combusting plant | Journal No. 4 Page 6 |
| E.ON Kraftwerke Power Plant Staudinger |
Erection of a sewage sludge co-combustion plant for the disposal of 60, 000 t sewage sludge annually (cooperation with Process Equipment Technology, Electrical & Mechanical Engineering) |
Journal No. 4 Page 4 |
| E.ON Kraftwerke Power Plant Shamrock Boilers 2 and 4 |
Conceptual design and implementation of the new oil ignition burner system and the automatic air flow control system | Journal No. 3 Page 15 |
| RWE Neurath | Modification of Pit Bunker Bucket Wheel Excavators | Journal No. 3 Page 13 |
| E.ON Kraftwerke Power Plant Scholven Unit C |
Modification of the feed water pump protective system from TELEPERM MEA to ABB Symphony | Journal No. 2 Page 24 |
| Hecking Deotexis GmbH, Neukirchen |
Follow-up order after the energy-related optimization of the steam generating facility I&C Optimisation of the control system (cooperation with Boiler Technology) |
Journal No. 2 Page 22 |
| E.ON Kernkraft Nuclear Power Plant Unterweser |
Overhaul I&C and electrical engineering (cooperation with Electrical Engineering) |
Journal No. 2 Page 18 |
| Leibstadt Nuclar Power Plant, Switzerland |
Modification work on stand-by diesel generators | Journal No. 2 Page 17 |