References Electrical Engineering
| Customer/ Plant | Project | Reference |
|---|---|---|
| Papermill Fripa | Energy supply ensured - Electrical and automation systems for new gas turbine power plant with waste and service (cooperation with I&C Technology) | Journal No. 12 Page 21 |
| E.ON Kraftwerke Power plant Farge |
Replacement of auxiliary supply and unit protection system Disassembly, assembly and commissioning |
Journal No. 10 Page 30 |
| E.ON Energy Projects Wind power facilities windfram Rheine |
Servicing the frequency converters in wind power facilities Inspection and maintenance work on eleven wind power facilities on Rheine wind farm |
Journal No. 10 Page 28 |
| Rieger Paper Mill |
Steam turbine retrofit to a combined heat and power plant (cooperation with I&C Technology) |
Journal No. 10 Page 22 |
| RuhrEnergie E.ON Kraftwerke 35 kV Grid |
20 MVA Transformer N32 exchange and repair | Journal No. 8 Page 25 |
| EnBW Power Plant Walheim |
Exchange of the generator transformer | Journal No. 7 Page 10 |
| BKB TRV Buschhaus |
Turbine overhaul (45 MW) Replacement of the old auxiliary condenser Complete inspection of the generator (cooperation with Mechanical Engineering, Process Equipment Technology) |
Journal No. 5 Page 16 |
| KNG E.ON Kraftwerke Power Plant Rostock |
Cooperation with E.ON Kraftwerke and E.ON Engineering during the replacement of the generator transformer | Journal No. 4 Page 17 |
| E.ON Kraftwerke Power Plant Staudinger |
Erection of a sewage sludge co-combustion plant for the disposal of 60, 000 t sewage sludge annually (cooperation with Process Equipment, Technology, I&C Technology, Mechanical Engineering) |
Journal No. 4 Page 4 |
| STEAG Power Plant Iskenderun, Turkey |
FGD Acceptance Measurments Power Measurements to determine the auxiliary power demand |
Journal No. 3 Page 8 |
| E.ON Kraftwerke Power Plant Staudinger Unit 5 |
Inspection of the generator high-voltage terminal and the generator transformer | Journal No. 3 Page 7 |
| E.ON Kernkraftwerk Nuclear Power Plant Grafenrheinfeld |
Commissioning of the generator protection and voltage regulating systems after the exchange of the generator stator | Journal No. 3 Page 6 |
| E.ON Kernkraftwerk Nuclear Power Plant Unterweser |
Commissioning of the generator protection and voltage regulating systems after the exchange of the generator stator | Journal No. 3 Page 6 |
| E.ON Kernkraft Nuclear Power Plant Isar 1 |
Overhaul of the generator bus ducts | Journal No. 2 Page 21 |
| E.ON Kernkraft Nuclear Power Plant Unterweser |
Overhaul I&C and electrical engineering (cooperation with I&C Technology) |
Journal No. 2 Page 18 |