References Boiler Technology
| Customer/ Plant | Project | Reference |
|---|---|---|
| Hitachi Power Europe unit 4 of the Datteln power station |
Assembly of upper boiler section | Journal No. 15 Page 17 |
| Müllverwertung Borsigstraße GmbH |
Boilers 1 and 2 Extension of Economisers |
Journal No. 9 Page 20 |
| Infracor GmbH Gas and Steam Turbine Power Plant 3 |
Exchange of burner and flue gas duct system | Journal No. 9 Page 16 |
| E.ON Benelux Power Plant Maasvlakte Units 2 and 1 |
Overhaul assignments completed on schedule again | Journal No. 9 Page 14 |
| E.ON Kraftwerke Power Plant Scholven Unit F |
Gear change on a Coal Mill | Journal No. 9 Page 12 |
| E.ON Benelux Power Plant Maasvlakte |
Hard coal mill 3 Trimming valves for Uniform Distribution |
Journal No. 9 Page 10 |
| Infracor GmbH Power Plant 1 Unit 4 |
Optimisation concept for the slag discharge pipe in a hard coal-fired boiler | Journal No. 9 Page 6 |
| E.ON Kraftwerke Power Plant Heyden |
Exchange of the Grnding Rollers 1 and 3 (mill type MPS-255) | Journal No. 7 Page 9 |
| BKB Aktiengesellschaft Power Plant Buschhaus Unit D |
Exchange of the fixed and floating bearings on two beater-wheel mills | Journal No. 7 Page 8 |
| RWE Power Power Plant Niederaußem Unit G |
Overhaul of the pressure-part system of the lignite-fired steam generator incl. delivery and installation | Journal No. 5 Page 13 |
| Waste incineration plant (MHKW) Burgkirchen |
Delivery and installation of tube walls, manual and automatic first cladding and recladding work | Journal No. 5 Page 9 |
| E.ON Kraftwerke Power Plant Scholven Unit F |
Component test facility COMTES700 Installation of all components |
Journal No. 5 Page 3 |
| Amberger Kaolin Werke, Schneitenbach |
Optimization of the hot air generation Installation of the new hot air plant Designing and equipping of the plant incl. electrical and I&C systems |
Journal No. 3 Page 12 |
| Waste Incineration Plant Stapelfeld GmbH Combustion lines 1 and 2 |
Replacement of the grate incl. grate substructure, ash handling system, as well as partial exchange of the pressurepart system | Journal No. 3 Page 10 |
| SaarEnergie GmbH Power Plant Weiher Unit 3, Quierschied |
Revamping in various places of the steam generator Design, construction and assembly Complete renewal of the evaporation hopper |
Journal No. 3 Page 9 |
| E.ON Kraftwerke Power Plant Franken 1 Units 1 und 2 |
Overhaul of steam generators, vessels, accessories, valves (cooperation with Process Equipment Technology) |
Journal No. 3 Page 4 |
| Hecking Deotexis GmbH, Neukirchen |
Follow-up order after the energy-related optimization of the steam generating facility I&C Optimisation of the control system (cooperation with I&C Technology) |
Journal No. 2 Page 22 |
| E.ON Kraftwerke Power Plant Staudinger Unit 5 |
"Overhaul was moved up by 2 weeks" Overhaul of the HD boiler field Support services during Technical Inspection Agency Hessen vessel tests |
Journal No. 2 Page 11 |
| E.ON Kraftwerke Power Plant Staudinger Unit 5 |
"As fast as lightning" Damage remedy of the coal mill type MPS 225 |
Journal No. 2 Page 10 |
| Cooperative Power Plant Kiel |
Boiler and mill overhaul inkl. the partial renewal of the reheater Delivery, disassembly and assembly |
Journal No. 2 Page 9 |
| STEAG AG Power Plant Herne Unit 4 |
Revamping of 3 turbine ball mills Exchange of front wall facing | Journal No. 2 Page 8 |
| Lignite-fired Power Plant | Preparation of the study on the implementation, as well as on the assembly concept Adjustment to the fuel quality |
Journal No. 2 Page 6 |
| Infracor GmbH, Marl Power Plant III |
Boiler modification after gas turbine replacement Concept, construction and assembly |
Journal No. 2 Page 4 |
| Waste Incineration Plant Burgkirchen |
Overhaul of the steam generator Replacement of the cladded membrane walls, automation and manual cladding |
Journal No. 2 Page 4 |
