Nuclear Power Plants
| Customer / Plant | Project | Reference | Division |
|---|---|---|---|
| Nuclear power plants in Germany |
Disassembly of major components with expertise and high-tech equipment - From disassembly to packing |
Journal No. 11 Page 7 |
Process Equipment Technology |
| E.ON Kernkraft Nucler Power Plant Unterweser |
Exchange of a tank for chemicals with 30,000 litres capacity | Journal No. 8 Page 10 |
Process Equipment Technology |
| E.ON Kernkraft Nuclear Power Plant Würgassen |
Dismantling of the LP turbine rotor Disassembly of the condenser |
Journal No. 8 Page 8 |
Process Equipment Technology |
| E.ON Kernkraftwerk Nuclear Power Plant Stade Nuclear Power Plant Würgassen |
Dismantling activities Disassembly and disposal |
Journal No. 4 Page 18 |
Process Equipment Technology |
| E.ON Kernkraftwerk Nuclear Power Plant Grafenrheinfeld |
Commissioning of the generator protection and voltage regulating systems after the exchange of the generator stator | Journal No. 3 Page 6 |
Electrical Engineering |
| E.ON Kernkraftwerk Nuclear Power Plant Unterweser |
Replacement of two heat exchangers in the feedwater system | Journal No. 3 Page 6 |
Electrical Engineering |
| Gemeinschaftskernkraftwerk Grohnde GmbH & CO.OHG |
Replacement of two heat exchangers in the feedwater system | Journal No. 3 Page 3 |
Process Equipment Technology |
| E.ON Kernkraft Nuclear Power Plant Isar 1 |
Overhaul of the generator bus ducts | Journal No. 2 Page 21 |
Electrical Engineering |
| E.ON Kernkraft Nuclear Power Plant Unterweser |
Overhaul I&C and electrical engineering | Journal No. 2 Page 18 |
Electrical Engineering I&C Technology |
| Leibstadt Nuclar Power Plant Switzerland |
Modification work on stand-by diesel generators | Journal No. 2 Page 17 |
I&C Technology |