Industrial Plants
| Customer / Plant | Project | Reference | Division |
|---|---|---|---|
| Papermill Fripa | Energy supply ensured - Electrical and automation systems for new gas turbine power plant with waste and service |
Journal No. 12 Page 21 |
Electrical Engineering Instrumentation and Control |
| Pfleiderer AG | Optimisation of PCS 7 Automation System - Upgrading of CHP Plant through application of Premium Plant Library |
Journal No. 12 Page 15 |
Instrumentation and Control |
| Innovatherm GmbH | High- End Boiler Protection Technology - Complete modernisation of safety- oriented control and monitoring functions |
Journal No. 12 Page 11 |
Instrumentation and Control |
| RWE Power AG Production facility Fortuna- Nord |
Production of activated lignite HOK® ensured Renewal of the burner safety controls for two rotary hearth furnaces |
Journal No. 11 Page 11 |
I&C Technology |
| Obernburg power plant | Development of a successful business relationship From the first overhaul to the establishment of a network of common interests |
Journal No. 11 Page 25 |
Mechanical Engineering Industrial turbines |
| Rieger Paper Mill |
Steam turbine retrofit to a combined heat and power plant | Journal No. 10 Page 22 |
I&C Technology Mechanical Engineering |
| Meggle AG, Wasserburg | Modification of turbine control system in an industrial plant Replacement of the hydraulic turbine control system with a digital control system |
Journal No. 10 Page 19 |
I&C Technology |
| WSW Wuppertaler Stadtwerke |
Modification of the boilers at Viehof heating plant Refurbishment of overall plant after reduction of burner capacity |
Journal No. 10 Page 8 |
I&C Technology |
| E.ON Ruhrgas High-pressure calibration facility |
Replacement of the control system in a high-pressure calibration facility Modernisation and optimisation |
Journal No. 10 Page 4 |
Boiler Technology |
| Infracor GmbH Gas and Steam Turbine Power Plant 3 | Exchange of burner and flue gas duct system | Journal No. 9 Page 16 |
Boiler Technology |
| Infracor GmbH Power Plant 1 Unit 4 |
Optimisation concept for the slag discharge pipe in a hard coal-fired boiler | Journal No. 9 Page 6 |
Boiler Technology |
| DK Recycling und Roheisen GmbH |
Replacement of the safety-related control and regulation of the ignition hood burner in the sintering plant | Journal No. 8 Page 28 |
I&C Technology |
| Deutsche BP AG Emsland Refinery |
Major valve overhaul | Journal No. 8 Page 16 |
Process Equipment Technology |
| Basell Polyolefine | Optimisation of the 23,5 MW turine extraction/ back-pressure control | Journal No. 7 Page 14 |
I&C Technology |
| Innovatherm GmbH | Conception and Exchange of the automation system | Journal No. 7 Page 11 |
I&C Technology |
| Basell Polyolefine GmbH | Overhaul and modification of a high pressure feedwater pum | Journal No. 7 Page 4 |
Mechanical Engineering |
| DaimlerChrysler AG Sindelfingen Plant |
Overhaul of the turbine and the gearing incl. working in the EAS Workshop Functional tests and commissioning |
Journal No. 3 Page 21 |
Mechanical Engineering |
| Amberger Kaolin Werke, Schneitenbach |
Optimization of the hot air generation Installation of the new hot air plant Designing and equipping of the plant incl. electrical and I&C systems |
Journal No. 3 Page 12 |
Boiler Technology |
| Hecking Deotexis GmbH, Neukirchen |
Follow-up order after the energy-related optimization of the steam generating facility I&C Optimisation of the control system |
Journal No. 2 Page 22 |
Boiler Technology I&C Technology |
