Conventional Power Plants
| Customer / Plant | Project | Reference | Division |
|---|---|---|---|
| swb Erzeugung | Installation of Titanum Tubing and Condenser - Installation of condenser tubing Assembly and installation connection tubing |
Journal No.12 Page 25 |
Process Equipment Technology |
| Datteln Power Plant | Turbo Group 5 back to Full- Load Operation - Completed on- schedule in spite of unscheduled assignment |
Journal No.12 Page 9 |
Mechanical Engineering |
| Staudinger Power Plant | Generator Overhaul 2008 - Inspection of generator and auxiliary equipment |
Journal No.12 Page 5 |
Mechanical Engineering |
| Obernburg Power Plant | Development of a successful business relationship - From the first overhaul to the establishment of a network of common intrest |
Journal No. 11 Page 25 |
Mechanical Engineering |
| Ingolstadt Power Plant | Reconditioning of cooling power pumps - Complete overhaul and modernisation |
Journal No. 11 Page 21 |
Mechanical Engineering |
| Staudinger Power plant | Modification of coal handling plant automation system - Conversion from Procontrol P 14 to Simatic PCS 7 |
Journal No. 11 Page 15 |
Instrumentation and Control |
| RWE Power | Production of activated lignite HOK ensured | Journal No. 11 Page 11 |
Instrumentation and Control |
| E.ON Kraftwerke Power plant Farge |
Replacement of auxiliary supply and unit protection system Disassembly, assembly and commissioning |
Journal No. 10 Page 31 |
Electrical Engineering |
| E.ON Kraftwerke Power plant Datteln |
EAS I&C involves in new construction projects for E.ON Kraftwerke Construction of process system on behalf of ABB |
Journal No. 10 Page 26 |
I&C Technology |
| Power generation and industrials plant |
Development of a power plant-compliant module library for PCS 7 version 7 completed | Journal No. 10 Page 15 |
I&C Technology |
| E.ON Benelux KW Maasvlakte Block E 1 |
Repair services of the EAS workshops Assessment, manufacturing of new parts and execution of repair work in 15 hours |
Journal No. 10 Page 14 |
I&C Technology |
| Müllverwertung Borsigstraße GmbH |
Boilers 1 and 2 Extension of Economisers |
Journal No. 9 Page 20 |
Boiler Technology |
| E.ON Benelux Power Plant Maasvlakte Units 2 and 1 |
Overhaul assignments completed on schedule again | Journal No. 9 Page 14 |
Boiler Technology |
| E.ON Kraftwerke Power Plant Scholven Unit F |
Gear change on a Coal Mill | Journal No. 9 Page 12 |
Boiler Technology |
| E.ON Benelux Power Plant Maasvlakte |
Hard coal mill 3 Trimming valves for Uniform Distribution |
Journal No. 9 Page 10 |
Boiler Technology |
| RuhrEnergie E.ON Kraftwerke 35 kV Grid |
20 MVA Transformer N32 exchange and repair | Journal No. 8 Page 25 |
Electrical Engineering |
| E.ON Benelux Power Plant Maasvlakte |
Design and construstion of the new control valve | Journal No. 8 Page 20 |
Process Equipment Technology |
| RWE Power Power Plant Weisweiler Unit H |
Austausch of HD tubes Planning, delivery, prefabrication, dis- and reassembly |
Journal No. 8 Page 12 |
Process Equipment Technology |
| EnBW Power Plant Walheim |
Exchange of the generator transformer | Journal No. 7 Page 10 |
Electrical Engineering |
| E.ON Kraftwerke Power Plant Heyden |
Exchange of the Grnding Rollers 1 and 3 (mill type MPS-255) | Journal No. 7 Page 9 |
Boiler Technology |
| BKB Aktiengesellschaft Power Plant Buschhaus Unit D |
Exchange of the fixed and floating bearings on two beater-wheel mills | Journal No. 7 Page 8 |
Boiler Technology |
| RWE Power Power Plant Niederaußem Unit H |
Valve overhaul on the main turbine T 7078 incl. repair and refurbishment of components | Journal No. 7 Page 7 |
Mechanical Engineering |
| RWE Power Power Plant Gersteinwerk Unit K |
Overhaul of the high pressure, intermediate pressure and bypass valves und repair service |
Journal No. 7 Page 6 |
Mechanical Engineering |
| Vattenfall Europe Power Plant Reuter Unit C |
Overhaul of the low pressure turbine 132 MW and repair of various other components | Journal No. 7 Page 3 |
Mechanical Engineering |
| E.ON Benelux Power Plant Maasvlakte |
Updating of the I&C concept within the projekt "Retrofit" | Journal No. 6 Page 12 |
I&C Technology |
| Mainz-Wiesbaden AG power plants Power Plant 2 |
Optimisation measure of the feedwater supply | Journal No. 6 Page 10 |
I&C Technology |
| STEAG Power Plant Voerde Units A and B |
Instrumentation and control overhaul of two hard coal-fired units, each with a capacity of 710 MW | Journal No. 6 Page 8 |
I&C Technology |
| E.ON Kraftwerke Power Plant Shamrock |
Optimisation of the waste water treatment plant automation level | Journal No. 6 Page 6 |
I&C Technology |
| E.ON Kraftwerke Power Plant Scholven Unit C |
Exchange automaton system and upgrade to fully-automated mode | Journal No. 6 Page 3 |
I&C Technology |
| E.ON Kraftwerke Power Plant Scholven FGD plants |
Automation of the measuring of solids in FGD plants | Journal No. 5 Page 23 |
I&C Technology |
| Cooperative power plant Veltheim Units 2 and 3 |
Alteration of coal handling plant process control system Automation of the unit coal handling facilities |
Journal No. 5 Page 20 |
I&C Technology |
| COMPACT Global Group Kraftwerk Bandar Eman Khomeyni, Iran |
Revamping and maintenance work on the gas turbine exhaust gas system | Journal No. 5 Page 19 |
Mechanical Engineering |
| STEAG Power Plant Lünen |
Complete turboset overhaul 110 MW railway power turbine |
Journal No. 5 Page 17 |
Mechanical Engineering |
| BKB TRV Buschhaus |
Turbine overhaul (45 MW) Replacement of the old auxiliary condenser Complete inspection of the generator |
Journal No. 5 Page 16 |
Mechanical Engineering Process Equipment Technology Electrical Engineering |
| MEGGLE AG HMB Combined heat and power station Meggle, Wasserburg |
Testing, examination and repair of the turbine incl. gearbox | Journal No. 5 Page 14 |
Mechanical Engineering |
| RWE Power Power Plant Niederaußem Unit G |
Overhaul of the pressure-part system of the lignite-fired steam generator incl. delivery and installation | Journal No. 5 Page 13 |
Boiler Technology |
| Waste incineration plant (MHKW) Burgkirchen |
Delivery and installation of tube walls, manual and automatic first cladding and recladding work | Journal No. 5 Page 9 |
Boiler Technology |
| E.ON Kraftwerke Power Plant Irsching Unit 3 |
440 MW Turbine Refurbishment of the drain studs of the high pressure turbine |
Journal No. 5 Page 7 |
Process Equipment Technology |
| RWE Power Power Plant Gersteinwerk Unit K |
Turbine Refurbishment of the drain studs on the control valves 1 to 4 of the high pressure turbine |
Journal No. 5 Page 6 |
Process Equipment Technology |
| E.ON Kraftwerke Power Plant Scholven Unit F |
Component test facility COMTES700 Installation of all components |
Journal No. 5 Page 3 |
Process Equipment Technology Boiler Technology |
| KNG E.ON Kraftwerke Power Plant Rostock |
Cooperation with E.ON Kraftwerke and E.ON Engineering during the replacement of the generator transformer | Journal No. 4 Page 17 |
Electrical Engineering |
| RWE Power Power Plant Niederaußem Units D and E |
Induced draft fans Replacement and overhaul of the rotor asswmbly of two KKK model AP2-35/23-induced draft fans |
Journal No. 4 Page 16 |
Mechanical Engineering |
| E.ON Kraftwerke Power Plant Robert Frank, Landesbergen |
Refurbishment of a live steam line | Journal No. 4 Page 12 |
Mechanical Engineering I&C Technology |
| Utility company Stadtwerke Flensburg |
Modernization of the turbine control system | Journal No. 4 Page 11 |
I&C Technology |
| E.ON Kraftwerke Power Plant Staudinger FGD |
Revamping the process control system of the FGD waste water plant | Journal No. 4 Page 10 |
I&C Technology |
| E.ON Kraftwerke Power Plant Scholven Unit F |
New pulverised-fuel supply tank Automation, field connection, sofware development and visualisation |
Journal No. 4 Page 9 |
I&C Technology |
| E.ON Kraftwerke Power Plant Scholven CHP Buer |
Component and air preheater fire monitoring Replacement by SIMATIC S7 300 | Journal No. 4 Page 8 |
I&C Technology |
| E.ON Kraftwerke Power Plant Staudinger |
I&C optimization of a sewage co-combusting plant | Journal No. 4 Page 6 |
I&C Technology |
| E.ON Kraftwerke Power Plant Staudinger |
Erection of a sewage sludge co-combustion plant for the disposal of 60, 000 t sewage sludge annually | Journal No. 4 Page 4 |
Process Equipment Technology Electrical Engineering I&C Technology Mechanical Engineering |
| E.ON Engineering USA |
USA - Catalyst Test Stand "Made in Germany" by E.ON AS |
Journal No. 3 Page 23 |
Mechanical Engineering |
| E.ON Kraftwerke Power Plant Staudinger Unit 1 |
Overhaul of the main turbine, feed pump turbine and all valves incl. Refurbishment and reproduction of exchanged parts in the central workshop | Journal No. 3 Page 22 |
Mechanical Engineering |
| Stadtwerke Duisburg CHP III B |
Repair of live the steam emergency stop valves, the live staem control valves, the reheat control valves | Journal No. 3 Page 20 |
Mechanical Engineering |
| E.ON Kraftwerke Power Plant Scholven Power Plant Datteln Cooperative Power Plant Hannover |
Refurbishment models for threaded studs of the HMN-series turbine | Journal No. 3 Page 18 |
Mechanical Engineering |
| E.ON Kraftwerke Power Plant Shamrock Boilers 2 and 4 |
Conceptual design and implementation of the new oil ignition burner system and the automatic air flow control system | Journal No. 3 Page 15 |
I&C Technology |
| RWE Neurath | Modification of Pit Bunker Bucket Wheel Excavators | Journal No. 3 Page 13 |
I&C Technology |
| Waste Incineration Plant Stapelfeld GmbH Combustion lines 1 and 2 |
Replacement of the grate incl. grate substructure, ash handling system, as well as partial exchange of the pressurepart system | Journal No. 3 Page 10 |
Boiler Technology |
| SaarEnergie GmbH Power Plant Weiher Unit 3, Quierschied |
Revamping in various places of the steam generator Design, construction and assembly Complete renewal of the evaporation hopper |
Journal No. 3 Page 9 |
Boiler Technology |
| STEAG Power Plant Iskenderun, Turkey |
FGD Acceptance Measurments Power Measurements to determine the auxiliary power demand |
Journal No. 3 Page 8 |
Electrical Engineering |
| E.ON Kraftwerke Power Plant Staudinger Unit 5 |
Inspection of the generator high-voltage terminal and the generator transformer | Journal No. 3 Page 7 |
Electrical Engineering |
| E.ON Kraftwerke Power Plant Shamrock |
Exchange of the hot reheat line 1 Delivery and assembly | Journal No. 3 Page 5 |
Process Equipment Technology |
| E.ON Kraftwerke Power Plant Franken 1 Units 1 und 2 |
Overhaul of steam generators, vessels, accessories, valves | Journal No. 3 Page 4 |
Boiler Technology Process Equipment Technology |
| E.ON Kraftwerke Power Plant Scholven Unit D |
General overhaul of the HP turbine Inspection of the branch point MAAG gear Rotor assembly inspection of the Voith variable-speed coupling Overhaul of the IP and bypass valves Inspection of the main pumps |
Journal No. 2 Page 26 |
Mechanical Engineering |
| E.ON Kraftwerke Power Plant Scholven Unit C |
Modification of the feed water pump protective system from TELEPERM MEA to ABB Symphony | Journal No. 2 Page 24 |
I&C Technology |
| E.ON Kraftwerke Power Plant Zolling |
Inspection and overhaul of the live steam, intercepting, bypass valves and segmental thrust bearings of the turbine | Journal No. 2 Page 14 |
Mechanical Engineering |
| E.ON Kraftwerke Power Plant Shamrock |
Exchange of hot preheat lines Delivery and installation |
Journal No. 2 Page 13 |
Process Equipment Technology |
| E.ON Kraftwerke Power Plant Staudinger Unit 5 |
"Overhaul was moved up by 2 weeks" Overhaul of the HD boiler field Support services during Technical Inspection Agency Hessen vessel tests |
Journal No. 2 Page 11 |
Boiler Technology |
| E.ON Kraftwerke Power Plant Staudinger Unit 5 |
"As fast as lightning" Damage remedy of the coal mill type MPS 225 |
Journal No. 2 Page 10 |
Boiler Technology |
| Cooperative Power Plant Kiel |
Boiler and mill overhaul inkl. the partial renewal of the reheater Delivery, disassembly and assembly |
Journal No. 2 Page 9 |
Boiler Technology |
| STEAG AG Power Plant Herne Unit 4 |
Revamping of 3 turbine ball mills Exchange of front wall facing | Journal No. 2 Page 8 |
Boiler Technology |
| Lignite-fired Power Plant | Preparation of the study on the implementation, as well as on the assembly concept Adjustment to the fuel quality |
Journal No. 2 Page 6 |
Boiler Technology |
| Infracor GmbH, Marl Power Plant III |
Boiler modification after gas turbine replacement Concept, construction and assembly |
Journal No. 2 Page 4 |
Boiler Technology |
| Waste Incineration Plant Burgkirchen |
Overhaul of the steam generator Replacement of the cladded membrane walls, automation and manual cladding |
Journal No. 2 Page 4 |
Boiler Technology |